Overview
This project shows our civil works process from start to finish. Our survey team set out the alignment and levels with GNSS equipment before any material was moved. The formation was then cleared, graded and prepared to receive fill.
Laterite was delivered by tipper, spread and compacted in controlled layers, followed by an aggregate base course shaped by motor graders and compacted by rollers, with a water tanker on hand for compaction and dust control. Banksmen guided plant throughout, and engineers checked levels as each layer went down.
Shoulders and side drains were trimmed and formed by hand and machine to protect the finished surface, and completed sections were measured on site with a measuring wheel.
Placeholder: project background: who it was for, why it was needed and the outcome
Gallery
Video
More projects

Building construction
A detached family bungalow taken from design through roof construction to a finished, landscaped home ready for handover.
Placeholder: town and state

Start a conversation
Tell us what you need to build. We’ll review your drawings or brief, visit the site where needed, and come back with a clear scope and quotation.